国产精品久久久久永久免费看-夜鲁很鲁在线视频-亚洲无av在线中文字幕-大地资源在线观看中文第二页

AC source power & DC source power manufacturing factory

How to distinguish DC charging pile from AC charging pile?

Charging pile is a charging facility for "refueling" electric vehicles. Its scientific name is "non-vehicle charger". Charging pile is divided into AC charging pile and DC charging pile. What is the difference between AC charging pile and DC charging pile?

The function of charging pile is similar to that of the tanker in the gas station. It can be fixed on the ground or wall, installed in public buildings (public buildings, shopping malls, public parking lots, etc.) and residential parking lot or charging station. It can charge various types of electric vehicles according to different voltage levels. The input end of the charging pile is directly connected with the AC network, and the output end is equipped with a charging plug for charging the electric vehicle.

At present, charging piles are divided into AC charging piles and DC charging piles. The output single-phase/three-phase alternating current of AC pile is converted into direct current through vehicle charger to charge vehicle-mounted batteries. The power of AC pile is generally small (7 kw, 22 kw, 40 kw, etc.). The charging speed is generally slow, so it is usually installed in parking lot and other places.

DC charging pile (or non-vehicle charger) is directly output direct current to charge vehicle-borne batteries. It has high power (60 kw, 120 kw, 200 kW or higher), and its charging speed is faster. Therefore, it is usually installed in charging stations beside expressways.

So how to judge whether a pile is a DC pile or an AC pile from its appearance?

Generally speaking, the DC charging pile is rough (because there are a certain number of AC-DC power supply modules inside, the higher the power, the more the number of modules, the larger the pile), and the AC charging pile is smaller. The more obvious difference is that its gun head (charging line) is different. The DC charging pile is a 9-wire plug, while the AC charging pile is a 7-wire plug.

The output of DC charging pile consists of nine wires: DC+, DC-, PE of equipment ground, S+, S-, CC1 and CC2 of charging connection confirmation line, A+, A-, of low-voltage auxiliary power supply line.

The output of AC charging pile consists of seven wires: AC power line L1, L2, L3; equipment ground line PE; midline N; connection confirmation line CC; control guide line CP.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 国产av影片麻豆精品传媒| 欧美日韩在线视频一区| 蜜桃网站入口在线进入| 亚洲gv白嫩小受在线观看| 情侣作爱网站| 国产suv精品一区二区6| 久久久精品午夜免费不卡 | 亚欧日韩欧美网站在线看| 精品久久久久香蕉网| 国内精品人妻久久毛片app| 国产亚洲日韩欧美一区二区三区| 久久久亚洲欧洲日产国码农村 | 欧美性大战久久久久xxx| 国产呻吟久久久久久久92| 国产激情一区二区三区| a国产一区二区免费入口| 午夜成人无码福利免费视频| 风流少妇按摩来高潮| 最新中文字幕av专区| 大地资源网高清在线播放| 午夜福利国产成人无码gif动图 | 欧美午夜特黄aaaaaa片| 办公室撕开奶罩揉吮奶头漫画| 久久伊99综合婷婷久久伊| 天天狠天天透天干天天怕∴| 国产精品亚洲片在线| 精品国产欧美一区二区| 日本免费一区二区三区高清视频| 日韩av激情在线观看 | 夜夜添无码试看一区二区三区 | 国产精品亚韩精品无码a在线| 亚洲色拍拍噜噜噜最新网站| 丰满老熟妇好大bbbbb| 日本丰满熟妇hd| 中国鲜肉gay高中xx禁18网站| 亚洲第一se情网站| 夫妇交换性三中文字幕| 日韩一区二区三区射精-百度| 久久久免费精品re6| 欧美黑人巨大xxxxx| 久久综合九色综合欧美就去吻|