国产精品久久久久永久免费看-夜鲁很鲁在线视频-亚洲无av在线中文字幕-大地资源在线观看中文第二页

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 亚洲av永久无码精品秋霞电影影院| 亚洲国产一二三精品无码| 日韩 欧美 动漫 国产 制服| 亚洲丁香婷婷综合久久| 天天做天天躁天天躁| 亚洲色欧美在线影院| 樱桃视频大全免费高清版观看下载| 亚洲 欧美 清纯 校园 另类| 福利体验试看120秒| 天堂资源官网在线资源| 小13箩利洗澡无码视频免费网站 | 久青草久青草视频在线观看| 大地网资源在线观看免费高清| 久久精品人妻中文系列| 夜夜爽一区二区三区精品| 亚洲综合av一区二区三区不卡| 色妞www精品视频| 亚洲春色av无码专区在线播放| 在线欧美中文字幕农村电影| 日韩av无码中文一区二区三区| 欧美巨鞭大战丰满少妇| 人妻丰满熟妇岳av无码区hd| 久激情内射婷内射蜜桃| 久久亚洲精品成人无码| 最近中文字幕mv免费高清动漫| www夜片内射视频在观看视频| 久久9精品区-无套内射无码| 久久久久波多野结衣高潮| 琪琪的色原网站| 国内老熟妇对白xxxxhd| 狠狠综合亚洲综合亚洲色| 国产乱女乱子视频在线播放| 天干夜天天夜天干天2004年| 人人妻人人澡人人爽欧美精品| 无码人妻久久久一区二区三区 | 国产精品熟女一区二区| 亚洲综合色婷婷在线观看| 忍不住的亲子中文字幕| 精品无码国产自产在线观看水浒传| 亚洲色精品88色婷婷七月丁香| 好男人社区影院www|